2,500TON CAISSON LIFTING & TEMPORARY SETTING IN BUSAN NEW PORT CONSTRUCTION(2008~2009)
     
     
     

BRIDGING WITH 2,000TON SHEERLEG IN EULSUK BRIDGE CONSTRUCTION (Oct, 2008)
 
     
     
     

2,500TON CAISSON LIFTING, TRANSPORTATION & TEMPORARY SETTING UP (AUG 2008 ~ )

2,500tons caissons for the construction of Pusan New Port wharf were lifted by 3,000tons (SWL) of floating sheerleg and fill seawater to ensure sailing draft at certain site.

And towed it to temporary setting site and pumped seawater in caisson to sink it down for temporary setting at the designated area with DGPS before real operation on April, 2009. All of this operations were under our operation.

 
     
     
     

Bridge Girder Lifting & Installation (May~Aug, 2008)

800tons x 4units of bridge girders were transported and lifted by 2,000tons of floating crane and installed on pier at Pusan, Korea